Del-DOT Project : HSIP NCC, Greenbank Road and Albertson Boulevard Intersection ImprovementsProject Limits:
The proposed safety improvements are located along Greenbank Road from 0.07-mile west of Albertson Boulevard to 0.11-mile west of Centerville Road.
Project Need:
This project was identified in the Highway Safety Improvement Program (HSIP) due to high crash rates. The majority of crashes at Greenbank Road and Albertson Boulevard were rear-end crashes related to the absence of a dedicated left-turn lane. Accommodations for pedestrian, bicycle and transit facilities are also not up to current safety standards.
Project Desription:
Proposed improvements include modifying the lane configuration on the westbound Greenbank Road approach to Albertson Boulevard to provide a separate left-turn lane and a shared through/right-turn lane, lengthening the right-turn lane on eastbound Greenbank Road at Albertson Boulevard and improving pedestrian and bicycle safety with crosswalks, sidewalks, bus stops and bicycle lanes.
Anticipated/Actual Start Date
Anticipate to begin Construction in summer 2011
Anticipated/Actual Completion Date
To Be Determined.